Overview for Traditional ROW Maps

Once ROW map revisions are complete,
all
new ROW is acquired, and
all
documents are recorded,
upload
original PDF of the ROW map marked "FINAL MAP" to ROW Division via
OnBase
. For the final map to be complete, it must contain:
  • all project numbers;
  • grantors' names;
  • areas of acquired parcels;
  • recording information;
  • a "U" number assigned for utility adjustments/accommodations;
  • names of the utility owner(s) and recording data for recorded documents, when applicable;
  • at least one signature and date
    ;
  • DGN graphics
    files;
    and
  • GIS
     files, if available.
Verification of the above list can be done by any of the following:
  • District Surveyor
  • Right of Way District Manager
  • Utility Coordinator
  • Right of Way or District Records Coordinators
Completing this process will minimize district
and division staff
time spent researching ROW maps.