ROW Preliminary Procedures for the Authority to Proceed Manual
Surface Coordinates
Surface adjustment factors and basis of datum shall be well documented in all electronic deliverables "file structure/deliverables read me" file.
Section 7: Requirements for Submission of Graphics Files for On-System Projects