El Paso District west area project, maintenance closures
Artcraft Project
9 p.m. – 6 a.m. (Nightly)
Sunday, July 26 – Thursday, July 30
Sunday, August 2 – Thursday, August 6
- I-10 east and westbound between Loop 375 (Transmountain) and Artcraft full closure
Crews will be placing steel girders.
Monday, July 27 – Friday, July 31
9 a.m. - 4 p.m. (As Needed)
- SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures
Crews will be working on ITS/Illumination and MSE wall installation.
- North Desert between Helen of Troy and Cheddars Restaurant alternate lane closures
- South Desert between Charlie Clark Nissan and Blue Sky alternate lane closures
Crews will be forming bent caps.
- I-10 west and eastbound between Redd and Transmountain alternate lane closures
Crews will be working on median columns steel and erecting formwork.
Continuous Closures Until Further Notice 24/7
Monday, June 1 – Beginning of August 2026 (Approx. 8-9 weeks)
- Santiago at Artcraft intersection closed
Crews will be working on a water main, storm drain, and paving.
Borderland Expressway Phase 2 Project
Monday, July 27 - Friday, July 31
Daily, 7 a.m. - 5 p.m.
- US-54 east and westbound between Mesquite Hills and McCombs alternate lane closures
- Mesquite Hills reduced to one lane between US-54 and Red Man.
- Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite Hills
- Flaggers will be on-site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts intersection.
Crews will be transporting earth embankment into the project.
Runaway Truck Ramp Project
Monday, July 27 (overnight)
9 p.m. - 5 a.m.
- Loop 375 (Transmountain) east and westbound between I-10 and US-54 alternate lane closure
Crews will be working on repositioning barrier.
Bridge Replacement at Alps Dr., Hollings St., and Concepcion St. Project
Continuous Closure Until Further Notice 24/7
- Alps between Marie Tobin and Raymond Telles closed
- Hollings between Raymond Telles and Hondo Pass closed
Detour: Please follow and proceed with detours in the area.
Crews will be working on culvert and bridge rehabilitation.
ITS on Bridge of the Americas and Zaragoza Port of Entry Project
Monday, July 27 – Friday, July 31
9 a.m. - 4 p.m.
- Loop 375 (Border Highway) eastbound between Zaragoza and Padres right lane and shoulder closed
Crews will be working on sign foundation.
- Loop 375 (Border Highway) westbound between Padres and Zaragoza entrance ramp closed
Crews will be working on sign.
- Loop 375 (Border Highway) westbound between Padres and Zaragoza right lane and shoulder closed
Crews will be working on sign service pole install and fiber install.
- Loop 375 (Border Highway) eastbound between Midway and Columbia Apartments right lane and shoulder closed
Crews will be working on sign foundation.
- Loop 375 (Border Highway) westbound between Midway and Columbia Apartments right lane and shoulder closed
Crews will be working on sign.
- Loop 375 (Border Highway) eastbound between Fonseca and Midway right lane and shoulder closed
Crews will be working on sign infrastructure.
- Loop 375 (Border Highway) westbound between Midway and Fonseca right lane and shoulder closed
Crews will be working on sign infrastructure.
- US-54 southbound at Cambridge between Altura and Trowbridge right lane and shoulder closed
Crews will be working on sign structure.
- Loop 375 (Border Highway) eastbound between San Marcial and Ramp M shoulder closed
Crews will be working on fiber splicing for signs.
Traffic Signal Improvements – Loop 478 at Yandell and Montana at Trowbridge
Monday, July 27 – Friday, July 31
7a.m. - 4 p.m.
- Montana between Chelsea Street and McAffee Place all directions right lane closed
- Trowbridge between Paisano and Forest Way all directions right lane closed
Crews will be performing demolition and layout of new corners for the ADA ramps and the adjustments for the new traffic signals and PED poles.
Loop 375 Rehabilitation Project
Sunday, July 26 – Thursday, July 30
8 p.m. – 6 a.m. (Nightly)
- Loop 375 (Border Highway) westbound between Fonseca and Oregon full closure
- Loop 375 (Border Highway) westbound entrance ramp from US-54 full closure
- Loop 375 (Border Highway) westbound entrance ramp from Delta full closure
- Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures
Crews will be working on paving.
Saturday, August 1
6 a.m. – 4 p.m.
- Loop 375 (Border Highway) westbound between Fonseca and Oregon full closure
- Loop 375 (Border Highway) westbound entrance ramp from US-54 full closure
- Loop 375 (Border Highway) westbound entrance ramp from Delta full closure
- Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures
Crews will be working on milling and paving.
Districtwide Striping Project
Sunday, July 26 – Thursday, July 30
Sunday, August 2 – Thursday, August 6
9 p.m. – 6 a.m. (Nightly)
- I-10 east and westbound between Horizon and Paisano mobile operations
Crews will be removing and installing pavement markings
BU-54A Safety Improvements
Monday, July 27 – Friday, July 31
Daily, 9 a.m. – 4 p.m.
- BU-54A (Dyer) north and southbound between Ashley and Mesquite Flor right lane and shoulder alternate lanes closed
Crews will be working on concrete work.
Guardrail Repair
9 a.m. – 4 p.m.
Monday, July 27
- I-10 westbound between Mesa Park and Sunland Park left lane closed
Tuesday, July 28
- US-54 North between Pershing and Cassidy right lane closed
Wednesday, July 29
- Loop 375 (Transmountain) westbound between US-54 and Main Gap picnic area right lane closed
Thursday, July 30
- I-10 westbound between Los Mochis and Vinton right lane closed
Friday, July 31
- SH-20 (Doniphan) at FM-259 right lane closed
Miscellaneous Concrete
9 a.m. – 4 p.m.
Monday, July 27 – Tuesday, July 28
- Turn around between Gateway East and West complete closure
Wednesday, July 29 – Thursday, July 30
- McCombs southbound between Dyer and Woodrow Beam right lane closed
Crews will be working on concrete repairs.
Maintenance
Sunday, July 26
4 a.m. – 5 p.m.
- Ramp K between US-54 South and I-10 West closed
- Entrance ramp between Trowbridge and US-54 South closed
Crews will be working on bridge joints.
Monday, July 27 – Friday, July 31
9 a.m. - 4 p.m.
- US-54 north and southbound between Diana and Sun Valley alternate lane closure
- US-54 North at Diana entrance ramp closed
- US-54 North at Sun Valley exit ramp closed
- US-54 South at Sun Valley entrance ramp closed
Crews will be working on the bridge.
- Loop 375 (Transmountain) westbound between Tom Mays Park entrance and Paseo Del Norte right lane closed
Crews will be working on shoulder.
- Spur 601 east and westbound between Chaffee and US-54 alternate lane closures
- Spur 601 westbound at Chaffee entrance ramp closed
- Spur 601 eastbound at Chaffee exit ramp closed
Crew will be doing crack sealing.
Thursday, July 30
9 a.m. – 4 p.m.
- Loop 375 (Border Highway) westbound at Exit 62 full closure
- Spur 1966 entrance ramp to Loop 375 closed
Crews and Signal Shop will be removing signs.
Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.