US 287 from Boyce Road to Cooke Road
Virtual public meeting with in-person option
Virtual: Thursday, March 9, 2023, at 5:30 through Friday, March 24, 2023, at 11:59 p.m.
In-person: Thursday, March 9, 2023, 5:30 p.m. to 7:30 p.m.
Public comment deadline | All comments must be received on or before Friday, March 24, 2023. |
Virtual details | The virtual public
Additionally, TxDOT is providing an in-person meeting option for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public meeting. |
In-person details | Thursday, March 9, 2023 5:30 - 7:30 p.m. Ennis High School 2301 Ensign Road Ennis, TX 75119 |
Purpose | TxDOT is proposing improvements to the US 287 corridor, from Boyce Road to Cooke Road in Ellis County, Texas. |
Description | The project is located along US 287 from Boyce Road to Cooke Road and includes:
The project is approximately 1.4 miles long. The existing right of way is 250 feet and the proposed right of way ranges between 297 and 324 feet. |
Accessibility | The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the Public Information Office at (214) 320-4480, TxDOT Dallas District, no later than 4 p.m. Monday, March 6, 2023. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange. |
Meeting materials | |
How to make a comment | Comments must be postmarked or otherwise received by Friday, March 24, 2023 to: TxDOT Dallas District Office, Attn: Jordan Mrayyan, P.E., 4777 East U.S. Highway 80, Mesquite, TX 75150; by email as described in the |
Memorandum of Understanding | The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT. |
Posted: Feb. 13, 2023