I-14 Extension: Loop 363/US 190/SH 36 improvements in Temple from I-35 TO SH 95
Skip to main content

I-14 Extension: Loop 363/US 190/SH 36 improvements in Temple from I-35 TO SH 95

Virtual public meeting with in-person option

Virtual: Wednesday, June 5, 2024, by 5 p.m. CT

In-person: Wednesday, June 5, 2024, from 5 p.m. to 7 p.m. CT

Video presentations

Public comment deadline Comments must be received or postmarked by Thursday, June 20, 2024, to be included in the official documentation. 
Virtual details

The virtual meeting will consist of a pre-recorded video presentation and will include both audio and visual components.  The presentation will be posted to this page by Wednesday, June 5, 2024, by 5 p.m.

In-person details

The in-person meeting will be held at the following date, time and location:

Wednesday, June 5, 2024
5 to 7 p.m.
Frank W. Mayborn Civic and Convention Center
3303 N. 3rd Street
Temple, TX 76501

In-person attendees will be able to view the same presentation delivered in the online public meeting which will be playing on a screen, review hard copies of project materials, ask questions of TxDOT staff and/or consultants, and leave written comments.

Purpose TxDOT is proposing to improve Loop 363/US 190/SH 36 from I-35 to SH 95 (also referred to as “Segment 2”) in Temple, Bell County, Texas County, Texas.
Description

The Loop 363/US 190/SH 36 improvements in Bell County stretch five miles from I-35 to SH 95 in Temple. The proposed improvements include: widening Loop 363/US 190/SH 36 in Segment 2; and improving overall safety, connectivity and mobility. Currently, the existing typical section along this corridor of Loop 363/US 190/SH 36 includes, in each direction, two general-purpose lanes and two to three frontage road lanes; the proposed typical section would include, in each direction, an additional general-purpose lane for a total of three general-purpose lanes, two to three frontage road lanes and a shared-use path. Segment 2 is part of a larger project that will extend I-14 from its current terminus in Belton to BU 190 in Rogers, comprising a total of three segments.

The proposed project may involve construction in wetlands.  

The proposed project may involve an action in a floodplain.

Accessibility The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the Waco District at 512-537-7117 no later than 4 p.m. CT Thursday, May 30, 2024. Please be aware that advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.
Meeting materials
How to make a comment

Please provide your comment in any of the following ways:

  • In-person at the public meeting
  • Email as shown in the notice
  • Mail:
    TxDOT Waco District Office 
    I-14 Extension – Segment 2 Project Team
    1608 W 6th Street
    Austin, Texas 78703

Comments must be received or postmarked by Thursday, June 20, 2024, to be included in the official record of the public meeting.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.

Posted: May 21, 2024