Project background
The Texas Department of Transportation San Antonio District is proposing improvements to FM 3351, from I-10 to Desperado Way, in Bexar County, Texas. TxDOT has been working collaboratively with Bexar County, Camp Stanley, and potentially affected property owners to identify corridor issues and concerns.
Project description
TxDOT is proposing to widen FM 3351 from I-10 to Desperado Way, a project limit of approximately three miles. From I-10 to Camp Stanley’s main gate, FM 3351 would be widened from a two-lane undivided roadway to a six-lane divided roadway, with three travel lanes in each direction separated by a raised median. From Camp Stanley’s main gate to Desperado Way, FM 3351 would be widened from a two-lane undivided roadway to a four-lane undivided roadway, with two travel lanes in each direction and a center left-turn lane. North of Desperado Way, FM 3351 would transition back to the existing two-lane undivided roadway. The project would also include accommodations for bicycles and pedestrians. The widths of the existing right of way range from 78 to 160 feet, while the estimated widths of the proposed right of way range from approximately 125 to 200 feet.
Anticipated project schedule
The proposed project began in 2019, and the tentative project schedule (subject to change) is shown below:
Public involvement
TxDOT is committed to creating robust public involvement opportunities that foster engagement and transparency. This approach ensures that community input plays a key role in guiding the planning and decision-making process.
- Sept. 17, 2024: Virtual Public Meeting with In-Person Open House
- Nov. 14, 2025: Notice and Opportunity to Comment
Proposed project updates
To receive email updates on the proposed project, Click Here to Opt-in. For questions about the proposed project, please email your name and contact information to FM3351@pozcam.com. Please include “Updates on FM 3351 from I-10 to Desperado” in the subject line.