SH 288 Managed Lanes Project
Skip to main content

SH 288 Managed Lanes Project

Formerly known as the SH 288 Toll Lanes Project, the SH 288 Managed Lanes Project was authorized by the Texas Transportation Commission (Commission) after termination of the Concession Agreement ocurred on October 8, 2024.

The Commission determined that termination for convenience of the Concession Agreement was in the best interest of TxDOT and control of the Project reverted control back to the Department. The Commission has also authorized the Texas Transportation Finance Corporation (a non-profit corporation created by the Texas Transportation Commission) to further develop and operate the Project.

Project info

Developer/DB Contractor:
Blueridge Transportation Group

Independent Quality Firm (IQF): Rodriguez Engineering Laboratories

CCSJ: 0598-01-090

Project ID: A00094000

713-802-5076