SH 360 - request for qualifications (RFQ)
SH 360
Authorizations and approvals
On February 27, 2014, the Texas Transportation Commission (TTC), in Minute Order 113861, authorized TxDOT to publish a request for qualifications for the development, design, construction, and maintenance of the SH 360 Project.
TxDOT posted the list of qualification teams on June 2, 2014. Documentation is provided in the support documents link in the section below.
RFQ documents
TxDOT issued the original RFQ on March 10, 2014 and distributed three subsequent addenda. Addendum No. 03 was posted on May 20, 2014. These documents are available below.
Project documents
The RID Index provides a list of all reference information documents (RID) for the SH 360 Project. These documents are available upon request.