Loop 375 Border Highway - request for qualifications (RFQ)
Loop 375 Border Highway West Extension
Authorizations and approvals
On xx, the Texas Transportation Commission (TTC), in Minute Order 113618, authorized the issuance of a request for qualification (RFQ) to design, develop, construct, and maintain the Loop 375 Border Highway West Extension Project.
An Pre-QS Workshop was held on August 14, 2013.
On Sept. 16, 2013, TxDOT posted the list of qualification submittal teams for the Border Highway West Extension Project. On October 31, 2013, TxDOT announced the short list of the most qualified teams to compete for the design-build contract. The teams were invited to submit detailed proposals.
RFQ documents
TxDOT issued the original RFQ on July 26, 2013. There were three subsequent addenda issued. These documents are available below.
Addendum No. 03 - Issued September 6, 2013 |
---|
Cover Letter |
Request for Qualifications (RFQ) |
RFQ Redline |
RFQ Forms |
Addendum No. 02 - Issued September 4, 2013 |
---|
Cover Letter |
Request for Qualifications (RFQ) |
RFQ Redline |
RFQ Forms |
Addendum No. 01 - Issued August 9, 2013 |
---|
Cover Letter |
Request for Qualifications (RFQ) |
RFQ Redline |
RFQ Forms |
Original - Issued July 26, 2013 |
---|
Cover Letter |
Request for Qualifications (RFQ) |
Document | Dated Issued |
---|---|
Q&A Matrix No. 01 | August 9, 2013 |
Q&A Matrix No. 02 | August 26, 2013 |
Q&A Matrix No. 03 | September 4, 2013 |