Dallas Horseshoe - request for proposals (RFP)
Dallas Horseshoe
Authorizations and approvals
On June 28, 2012, the Texas Transportation Commission (TTC), in Minute Order 113157, authorized TxDOT to issue a request for proposal (RFP) for the design, construction and capital maintenance on IH 30 from Sylvan Avenue to IH 35E and IH 35E from north of Eighth Street to the IH 30/IH 35E interchange in Dallas County (the Horseshoe Project or Horseshoe).
Proposer information
On March 29, 2012, TxDOT announced the short list of the most qualified teams to compete for the Horseshoe Design-Build contract. The proposer team's major participants are listed below.
Name | Major Participants |
Pegasus Link Constructors (PLC) |
|
Dallas Horseshoe Solutions (DHS) |
|
NorthGate Horseshoe Constructors |
|
RFP documents
The original RFP was posted on July 3, 2012 and four subsequent addenda issued. Addendum No. 04 was issued September 28, 2012. These documents are available below.
Request for Proposals (RFP) |
RFP Final (Original) |
RFP Addenda |