- TxDOT has completed the Final Environmental Impact Statement (Final EIS) for the proposed North Houston Highway Improvement Project (NHHIP). The Final EIS incorporates input received on the Draft FEIS and includes project design changes made after the Draft EIS, as well as more refined and definitive information on the project’s environmental concerns, impacts, and mitigation.
- The final EIS includes three volumes which are available at the links below.
- Volume I contains the body of the final EIS and includes an executive summary, which can be downloaded separately at the links below in English and Spanish. The summary provides a snapshot of the project background and its need and purpose; summaries of alternatives considered and environmental impacts; and the preferred alternative to improve mobility and safety throughout the NHHIP corridor, from downtown Houston to Beltway 8 North.
- Volume II includes final EIS exhibits; schematics and typical sections for the preferred alternative; technical reports; and documentation of agency coordination and public involvement.
- Volume III contains responses to comments on the draft EIS and the draft technical reports for the final EIS.
- Final Environmental Impact Statement, August 2020
Volume I Final Environmental Impact Statement (EIS)
Volume II Final EIS Appendices
- Volume II Cover and list of contents
- Appendix A: Final EIS exhibits
- Appendix B: Preferred Alternative Schematic and Typical Sections
- Segment 1-December 2019:
- Segment 2-May 2019:
- Segment 3-May 2019:
- Segment 3: Downtown Loop overall plan view
- Segment 3: I-45 from Scott St. to I-69
- Segment 3: I-45 from I-69 to Elysian St.
- Segment 3: I-45 from Elysian St. to Wrightwood St.
- Segment 3: I-69 from Montrose Blvd. to I-45
- Segment 3: I-69 from I-45 to Lyons Ave.
- Segment 3: I-10 from Houston Ave. to McKee St.
- Segment 3: I-10 from McKee St. to Waco St.
- Segment 3: SH 288 from Binz St./Calumet St. to I-45
- Segment 3: Downtown connectors
- Appendix C: Air Quality Technical Report
- Appendix D: Archeological Survey Report and Coordination
- Appendix E: Biological Resources Technical Report
- Appendix F: Community Impacts Assessment Technical Report
- Appendix G: Hazardous Materials Technical Report
- Appendix H: Historical Resources Survey Report — Updated
- Appendix I: Traffic Noise Technical Report
- Appendix J: Water Resources Technical Report
- Appendix K: Waters of the United States Technical Report
- Appendix L: Visual Impact Assessment Technical Report
- Appendix M: Agency coordination documentation
- Appendix N: Public involvement
- Appendix O: Individual Section 4(f) Evaluation
- Appendix P: Indirect Impacts Technical Report
- Appendix Q: Cumulative Impacts Technical Report
- Appendix R: Programmatic Agreement
Volume III Comments and responses
- Volume III Cover and list of contents
- Comments and responses on draft EIS
- Comments and responses on draft technical reports
Appendices:
- Appendix A: Draft EIS exhibits
- Appendix B: Plan View and Section Views of Alternatives
- Appendix C: Air Quality Technical Report
- Appendix D: Archeological Coordination
- Appendix E: Biological Resources Technical Report
- Appendix F: Community Impact Assessment Technical Report
- Appendix G: Hazardous Materials Technical Report
- Appendix H: Historical Resources Survey Technical Report
- Appendix I: Traffic Noise Technical Report
- Appendix J: Water Resources Technical Report
- Appendix K: Waters of the United States Technical Report
- Appendix L: Visual Impact Assessment Technical Report
September 2015-Revised Conceptual Layouts and Typical Sections for Proposed Recommended Alternative